Communicate with Supplier? Supplier
LIU JIAN Mr. LIU JIAN
What can I do for you?
Contact Supplier

Jinan Boiler Group Co., Ltd.

Products

Home > Products > Boiler PartsPressure Parts

Pressure Parts

Product categories of Pressure Parts, we are specialized manufacturers from China, Spare Parts, Slant Fin Boiler suppliers/factory, wholesale high-quality products of Central Boiler Parts R & D and manufacturing, we have the perfect after-sales service and technical support. Look forward to your cooperation!

View :

    • Boiler Drum Boiler pressure parts
    • Boiler Drum Boiler pressure parts
    • Boiler Drum Boiler pressure parts
    • Boiler Drum Boiler pressure parts
    • Boiler Drum Boiler pressure parts
    • Boiler Drum Boiler pressure parts

    Boiler Drum Boiler pressure parts

    • Packaging: steel frames and iron cases
    Company introduction Established in 1954 Jinan Boiler Group Co Ltd Hereinafter called JBG is a large backbone company that manufactures Grade A power boilers and industrial boilers in China and is also one of the leading companies for CFB boiler and biomass boilers With the total asset value being over RMB 2 billion...
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System
    • Membrane Water Wall of Boiler Water Cooling System

    Membrane Water Wall of Boiler Water Cooling System

    • Packaging: steel frames and iron cases
    1 Membrane Water Wall Material and Arrangement The furnace and roof are made up of membrane water wall and hung on the steel structure by upper hanging suspender of water cooling upper header Furnace intersecting surface is 3170 5290mm2 and the elevation of top furnace is 28877mm The membrane water wall is made up of...
    • High Pressure CFB Boiler Header of Boiler Parts
    • High Pressure CFB Boiler Header of Boiler Parts
    • High Pressure CFB Boiler Header of Boiler Parts
    • High Pressure CFB Boiler Header of Boiler Parts
    • High Pressure CFB Boiler Header of Boiler Parts
    • High Pressure CFB Boiler Header of Boiler Parts
    • High Pressure CFB Boiler Header of Boiler Parts

    High Pressure CFB Boiler Header of Boiler Parts

    • Packaging: steel frames and iron cases
    1 Header Arrangement Arrange convection heating surface of evaporator at the end part of boiler and total 46 ranks and made up by 42 3 piping Arrange 5 piping circulation The lower header is 426 16 and the collecting piping at top is 76 3 The whole system is natural circulation and hanging arrangement to increase...

China Pressure Parts Suppliers

Steel Frame, Platform and Stairs for Boiler:
The frame work is mental construction which can operate safely under 7 degree seismic intensity. Adopt diagonal bracing to strengthen in over 7 degree seismic intensity area. The steel frame is delivered in bulk and installed at site.
Arrange platform at furnace top, header, manhole, examine hole and soot blower to observe, operate and overhaul easily. Every platform is connected by stairs.The platform and stairs are twin channel arrangement. The boiler left and right can be passed.

New Products

Related Products List